Case Study #5: Excursion Inlet, AK Case Study #5: Excursion Inlet, AK

A major cannery operation in a remote part of Alaska experienced a fault in a generator switchboard through which all power to the cannery flowed. After temporary power was restored to the facilities, we assessed the damage and assisted with the permanent repair of the switchboard and the damaged generator control system.

The repairs were logistically challenging given the remote location of the plant and the short time frame due to the impending winter season. The damaged switchboard and control system was successfully repaired, on time, and ready for the critical over-winter service.